Études et réalisations en architecture textile

8709, 8e avenue,
Montréal, QC
Canada, H1Z 2X4

T 514 528-5555

info@sollertia.ca









  • Projects
  • Applications
  • Products
    • Façade systems
    • Basin covers
  • Firm
    • Who We Are
    • Where We Come From
    • Sustainable Development
    • The team
    • Awards and Distinctions
    • Press
  • Services
    • Design
    • Confectioning
    • Installation
    • Entretien
  • Textile Architecture
    • Membranes
    • Membrane geometry
    • Software
  • Blog
  • Contact
  • Français
  • Menu
English webpage
coming soon
< Projects

Olympic Park Sports Centre

Walls composed of 104 translucent tensioned membrane panels with various slopes and geometries. Technical design of panel systems and bearing structures, fabrication and installation.
Application Type
Walls
Client
Régie des installations olympiques (RIO)
Architect
Héloise Thibodeau Architect
Year
2014
Size
985 m²
Location
Montreal, QC

Other Projects

Résidence Sainte-Ursule
Dôme géodésique Statera
International Showplace
Bourbon Street Club – Vague

Études et réalisations en architecture textile

8709, 8e avenue,
Montréal, QC
Canada, H1Z 2X4

T 514 528-5555

info@sollertia.ca









  • Projects
  • Applications
  • Products
    • Façade systems
    • Basin covers
  • Firm
    • Who We Are
    • Where We Come From
    • Sustainable Development
    • The team
    • Awards and Distinctions
    • Press
  • Services
    • Design
    • Confectioning
    • Installation
    • Entretien
  • Textile Architecture
    • Membranes
    • Membrane geometry
    • Software
  • Blog
  • Contact
  • Français